What Is a Wage Determination? A Subcontractor's Guide

On covered federal construction, the pay floor for a job is not your usual rate — it is the project's wage determination. If you subcontract on federal work, that document sets the minimum wages you must pay your crews, and it is the schedule your certified payroll is checked against.

What a wage determination is

A wage determination (often shortened to "WD") is a schedule issued by the U.S. Department of Labor that lists the minimum wage rates and fringe benefits for each labor classification on a covered project. It is built from local prevailing rates, so a carpenter in one county and a carpenter in the next county can have different minimums. The contracting agency incorporates the applicable wage determination into the contract, and it reaches you through your subcontract.

What it contains

Where to find it

Start with the contract package. The solicitation or the prime's subcontract should identify the wage determination that applies, usually by its number. You can also look up current Davis-Bacon wage determinations by state, county, and construction type on SAM.gov. Keep the version your contract incorporates with the job file — that is the one you are held to.

General vs. project wage determinations

Most jobs use a general determination — published for a county and a type of construction, and covering many projects. Some large or unusual projects get a project determination built from a survey of that specific job. The type does not change your duty: pay the listed rates and fringes for the work your crews actually perform.

How to read it on a real job

  1. Find your county and the construction type on the determination.
  2. Find the classification that matches the work each worker actually performs.
  3. Compare the listed basic rate and fringe to what you pay. If you pay less, fix it before payroll — not after.
  4. Record the classification on your certified payroll, and keep your daily reports consistent with it.

If your trade is not listed

Specialty work sometimes has no matching classification. In that case an additional classification and rate can be added through the contracting officer — a process called "conformance" — using rates consistent with the determination. Do not quietly invent a rate on your own. Raise it with the prime or the contracting officer before the work starts.

Common mistakes

Your next step

Look up the wage determination for your trade and county on SAM.gov before you bid or mobilize. See what the prevailing rate really is — it drives your estimate, your certified payroll, and your compliance. For how it fits with the rest of the job, see Davis-Bacon Act basics, certified payroll, and the federal subcontract paperwork checklist.

Learn the paperwork. Get connected to the buyers.

Federal Sub Academy teaches the SF 1413, the daily report, and certified payroll step by step. Enrollment is open now — $2,495.95 one time for the full program.

Enroll now — $2,495.95 Student sign in

Get the free paperwork checklist

The core federal subcontract forms and records, on one page. Free, no sign-up.

Read the checklist